Skip to content
US-based CNC shops only. Free for buyers.Reply within 24 business hours
Reshoring

Reshoring machined parts: a practical guide

How to decide whether moving a machined part from an overseas supplier to a US shop makes sense, and how to do it without disrupting supply.

Start with landed cost

Compare the cost of a part delivered to your dock, not the number on the quote. For an offshore part that includes freight, duties, brokerage, inland trucking and the cost of carrying several months of inventory. Add a realistic allowance for late shipments and rejected lots.

Cost itemOffshoreUS shop
Piece priceOften lowerOften higher
Freight and dutiesAdded per shipmentDomestic freight only
Inventory heldWeeks to monthsDays to weeks
Travel for auditsInternationalDay trip
Engineering changeSlowFast

Which parts move first

  • Parts with frequent engineering changes
  • Parts with quality problems at the current supplier
  • Low volume, high mix parts where minimums hurt
  • Parts subject to domestic content rules
  • Heavy parts where freight is a large share of cost

How to move without a gap in supply

  1. Run a first article at the US shop while the current supplier keeps shipping.
  2. Approve the first article and build a small buffer.
  3. Move volume in stages, starting with the parts that gain the most.
  4. Keep the old supplier as backup until two or three US lots are delivered on time.

What a US shop needs from you

Current drawings and models, material specs, inspection requirements, annual volume and the lot sizes you actually order. If the part has a history of problems, share it. It helps the shop quote honestly.

Request quotes from US shops